Thames Flood Risk Advisory

Services

Four documents, and the judgement about which you need

Planning authorities ask for different combinations depending on the flood zone, the scale of the scheme and the use proposed. Below is what each report does. If you would rather just ask, send us the postcode.

Our services

FRA

Flood Risk Assessment

The core planning document for any site in Flood Zone 2 or 3, over one hectare, or at risk from surface water.

FREP

Flood Risk Emergency Plan

A practical evacuation and flood response plan for occupants, usually required by condition where access floods.

ST / ET

Sequential Test and Exception Test

The policy case for building here rather than somewhere drier — and, where required, the case for an exception.

SuDS

Drainage Strategy and SuDS

Surface water drainage design and a SuDS strategy that satisfies the Lead Local Flood Authority.

A rough guide

What tends to be asked for, and when

This is a starting point rather than a rule. Validation checklists vary between authorities, and the only definitive answer is the one your case officer gives.

Ask us about your site

A single house in Flood Zone 3
Flood risk assessment, and usually a flood risk emergency plan where the access road floods.
A new dwelling on a garden plot in Flood Zone 2
Flood risk assessment plus a sequential test, and a surface water drainage statement if the authority asks.
Ten or more homes, any flood zone
Drainage strategy and SuDS — the lead local flood authority is a statutory consultee at that scale.
A householder extension in Flood Zone 3
Flood risk assessment. The sequential test does not normally apply to householder development.
A change of use to residential
Flood risk assessment, and an exception test where a more vulnerable use is proposed in a higher risk zone.
Riverside houses on the Thames near Teddington Lock
Photo: brian gillman, CC BY 3.0

Beyond the planning stage

Conditions, objections and the awkward middle

Not every enquiry arrives at the start. Plenty come from people who already have a permission with a flood risk condition attached, or an objection letter they were not expecting.

We take that work on too: discharging pre-commencement conditions, responding to Environment Agency or lead local flood authority comments, and reviewing a report someone else prepared to say honestly whether it answers the point being made.

Not sure what your application needs?