Thames Flood Risk Advisory

Flood risk & drainage consultancy

Flood risk and drainage reports for planning

We prepare the flood risk assessments, drainage strategies and supporting evidence that planning officers, the Environment Agency and lead local flood authorities expect to see — set out clearly enough that they can find what they need first time.

Rooted in the Thames — London, the Thames Valley and the estuary. Working nationwide.

The Thames between Barnes and Hammersmith — reservoir wetland on one bank, dense riverside development on the other
Photo: Mike McBey, CC BY 2.0
  • Every source, not just the river

    Fluvial, tidal, surface water, groundwater, sewer and reservoir risk are each addressed, because that is what the checklist asks for.

  • Modelled data where it exists

    We request Environment Agency modelled levels for the site rather than reading a number off the public flood map.

  • Written for the case officer

    Findings first, method behind it. A planner should not have to be a hydrologist to follow the argument.

What we do

The reports your application is likely to need

Most schemes need one or two of these. If you are not sure which, send us the postcode and we will tell you.

FRA

Flood Risk Assessment

The core planning document for any site in Flood Zone 2 or 3, over one hectare, or at risk from surface water.

FREP

Flood Risk Emergency Plan

A practical evacuation and flood response plan for occupants, usually required by condition where access floods.

ST / ET

Sequential Test and Exception Test

The policy case for building here rather than somewhere drier — and, where required, the case for an exception.

SuDS

Drainage Strategy and SuDS

Surface water drainage design and a SuDS strategy that satisfies the Lead Local Flood Authority.

The core question

Will it be safe, and will it make things worse elsewhere?

Nearly every flood risk objection comes down to those two points. A good assessment answers them with levels rather than adjectives.

That means establishing the design flood level for the site, setting finished floor levels above it with freeboard, showing that anyone inside can get out safely, and demonstrating that the development does not take storage away from the floodplain or push water onto a neighbour.

Where the numbers are tight, we would rather tell you early than write around it.

More on flood risk assessments

Cross-section through a site in the floodplain A river channel on the left, with floodplain either side under water up to a dashed line marking the design flood level. A house stands on ground raised above that level, its finished floor level 300 millimetres higher again. An arrow shows the access route leaving the house, crossing flooded ground, and climbing to dry higher ground on the right. Design flood level Finished floor level 300 mm freeboard Access route, checked for depth River channel Floodplain Higher ground
A section through a typical floodplain site. Vertical scale is exaggerated so the freeboard is visible.

Who we work with

Same evidence, different starting point

A self-builder and a housebuilder need the same technical answer. They rarely need it explained the same way.

Architects
Reports that match your drawing set, with floor levels and site sections coordinated to what you are actually submitting.
Planning consultants
Sequential and Exception Test evidence prepared to sit alongside your planning statement, not to contradict it.
Developers
Flood risk and drainage evidence for outline and full applications, and for discharging conditions afterwards.
Builders and contractors
Focused reports to clear pre-commencement conditions so the programme is not held up.
Homeowners and self-builders
A single clear report for an extension, annexe or replacement dwelling, explained in language you can actually use.

How it works

Four steps, and no surprises on the invoice

We quote a fixed fee before starting. If the scope changes because the authority asks for something new, we tell you what it costs before we do it.

The full process, in detail

  1. Tell us about the site

    Send the address or postcode, a sketch or drawing if you have one, and what you are hoping to build. We check the flood zone, the mapped surface water risk and what the local authority normally asks for on sites like yours.

    No charge, and no obligation. If you do not need a report, we will say so.

  2. A fixed fee, in writing

    You get a written proposal setting out exactly which documents we will produce, what sits inside each one, what we need from you, and what it costs. If Environment Agency modelled data has to be requested, we tell you how that affects the timetable before you commit.

  3. Assessment, then a draft

    We gather the data, run the assessment and write the report — then send it to you in draft. You see it before your planning authority does, so anything that has changed on the drawings can be picked up while it is still easy to change.

  4. Issue, and stay with it to the decision

    The final report is issued in a form you can submit straight to the portal. If the case officer, the Environment Agency or the lead local flood authority comes back with questions, we answer them.

    Agree at proposal stage what is covered, so there is no argument about it later.

The Thames Estuary, looking across the marshes towards the Isle of Grain
Photo: Mike McBey, CC BY 2.0

Where we work

The Thames is where we know the ground best

The tidal reach through London, the non-tidal river through Berkshire and Oxfordshire, the estuary out into Kent and Essex — and the ordinary watercourses and surface water flow paths that cause most of the trouble in between.

The method does not change with the county. We take work on across England and Wales, and the flood zone your site sits in matters a great deal more than the distance from our desk.

  • Greater London
  • Thames Valley & Berkshire
  • Oxfordshire & Buckinghamshire
  • Surrey & North Hampshire
  • Thames Estuary & Gateway
  • Kent & Essex riverside
  • and nationwide

Common questions

The things people ask first

Do I actually need a flood risk assessment?

Usually yes if any part of the site is in Flood Zone 2 or 3, if the site is larger than one hectare, if it sits in an area the council has identified as having critical drainage problems, or if the mapping shows a risk from surface water, groundwater or the sewer network. Your local authority validation checklist is the definitive answer, and it varies between authorities. Send us the postcode and we will check it before you spend anything.

My site is in Flood Zone 1. Am I in the clear?

Not automatically. Flood Zone 1 only describes the risk from rivers and the sea. Surface water flooding causes a large share of the problems we see, and it is not shown on the flood zone map at all. Sites over one hectare in Flood Zone 1 still need an assessment, and many authorities ask for a drainage strategy regardless of zone.

How long will it take?

The part we control is quick. The part we do not is the data: where a report needs modelled flood levels from the Environment Agency, their data request runs to its own timetable, and that usually sets the date. We tell you the realistic delivery date in the proposal rather than after you have paid. If you are working to a submission deadline, say so in your first email and we will tell you honestly whether it is achievable.

What does it cost?

We quote a fixed fee for each project rather than publishing a rate, because the work varies so much. The things that move the price are the flood zone, whether modelled data already exists for that reach of river, how many separate documents the authority wants, and whether a sequential test is needed. You get the figure before any work starts.

Can you guarantee my application will be approved?

No — and it is worth being wary of anyone who says otherwise. The decision belongs to the planning authority and it weighs far more than flood risk. What a good report does is make sure flood risk is not the reason for a refusal: the right data, the tests the officer actually has to apply, and the residual risk dealt with rather than glossed over.

All common questions

Not sure what your application needs?

Send us the site address and a line about what you are proposing. We will tell you which reports the authority is likely to ask for, and what they will cost — usually within one working day.